| Install vented pressure transducers (with data logger) to record pre-restoration water levels upstream and downstream of the tide gate. Collect data for a full growing season prior to construction (or a full year, if possible, to document seasonal variations). | Continue to measure upstream and downstream water levels to document any improvements to tidal flushing and tidal range. Note: Post-construction data collection can end after Year 1 or otherwise match the seasonal date range of pre-project monitoring. | Not applicable |
| Collect water samples or in-situ measurements at regular intervals (e.g., bi-weekly, monthly) during the pre-project growing season for salinity, temperature, dissolved oxygen, and pH. | Continue water quality monitoring during the Year 1 post-project growing season (e.g., bi-weekly, monthly) to track changes in response to improved tidal flushing. | Not applicable |
| Use field survey and GIS (i.e., desktop review of recent aerial imagery), map existing vegetation zones and unvegetated mudflats, including areas of salt marsh, freshwater or brackish plant communities, and invasive species such as Phragmites. | Re-map vegetation zones annually each summer (starting in the first growing season after completion of construction) to document any re-establishment of salt marsh species, changes in the extent of the low marsh and high marsh zones, and die-off of freshwater species associated with increased tidal flushing and salinity. | Continue vegetation mapping to track the expansion and maturation of the restored salt marsh. |
| Use a surface elevation table (SET) to measure the current elevation of the marsh platform. This baseline data will allow for assessment of future marsh accretion or subsidence rates. | Not applicable | Continue to use the SET to measure changes in marsh elevation. Long-term data will be helpful in assessing how marsh conditions may change in response to sea level rise. |