Basic Properties

Type
Sluice Gate
Material
Metal
Control
Manual Gear
Condition
Fair
Geometry
Rectangular
Status
Active
Number of Gates
0

Operator & Management

Operator Type
PRIVATE
Operator
Cummings Properties
Permits
Purpose
Unknown

Dimensions & Elevations

Dimensions
3.5ft diameter, 2.5ft height
Invert Elevation
-0.31 NAVD88
Installation Date
Tidal Influence
Upstream: N/A NAVD88, Downstream: 5.7 NAVD88

Culvert Details

Restriction Type
Dam
Geometry
Other
Material
Concrete
Bottom Material
Number of Pipes
0
Dimensions
31ft diameter, 5.5ft height
Condition
Good
Comments
There was no culvert at this location, the restriction was a concrete dam built in 1904. The approximate spillway dimensions were as follows: width 31'; height 5.5'. The spillway appeared to be in good condition with no visible signs of deterioration.

Salt Marsh Field Assessment Results

Comprehensive field assessment data
2024 Field Assessment Protocols →

Physical Conditions Assessment

Channel Conditions

Channel Alteration and Ditching
Severe (>398 ft/acre)
Channel Constriction
Equal to channel
Channel Erosion
None
Sediment Deposits
None

Blockages

Debris Blockages
None
Evidence of Overtopping
No

Ecological Assessment

Habitat Observations

Ecological Impairment due to Tide Gate
Severe
Crab Burrow Intensity
None
Ponding and Die-off Depressions
Severe (>60% of marsh platform
Phragmites Present
Limited (<10%)

Invasive Species

Upstream Invasive Species
Yes
Downstream Invasive Species
No
Invasive Species Notes
Limited to small pockets of fringe.

General Comments

Tide gates are built into dam that creates Shoe Pond impoundment. Impoundment was mill pond created in early 1900s. Tide gates appear to managed as closed most of the time to maintain impoundment but limits upstream tidal influence, if any. Ponding has eliminated potential for salt marsh. Restoration potential is very limited.

Habitat Transects

First Transect (50 yards upstream of tide gate)

No data

Second Transect (150 yards upstream of tide gate)

No data

Third Transect (300 yards upstream of tide gate)

No data

Restoration Potential

Restoration prioritization and planning information from MassBays regional coordination

Assessment

Salt Marsh Impairment due to Tidal Restriction
Moderate
Potential Extent of Marsh Restoration
Moderate
Implementation Feasibility
High
Restoration Priority
High
Recommended Improvement Type
O&M and Infrastructure

Notes

Site shows moderate salt marsh impairment due to restricted tidal flow. Replacement with self-regulating tide gate could restore approximately 5-8 acres of degraded marsh habitat. Good access for construction equipment. Regional coordination completed with town DPW and conservation commission.

Historical Records

Legacy data from previous surveys and documentation

Environmental Data

Invasive Species
No
Restoration Status
Unknown
Invasive Comments
The upstream impounded area was an old mill pond (shoe pond); invasive marsh species were not observed.
Restoration Comments
Over 15 acres of potential river herring habitat.
Upstream Area

Notes & Comments

General Comments
Site is located at the Cummings Center at the downstream portion of Shoe Pond. Parking was readily available in the close vicinity of the site.
Operation Plan
No
Operation Comments
It appeared that the function of both gates was to potentially drain water out of the upstream impoundment for maintenance or other reasons.
Gate Comments
There were two tide gates at this location – Beverly-01A was located on the western end of the spillway and appeared to have been previously removed. Direct access to the tide gates and spillway was blocked by a chain link fence so measurements are approximate. At the time of the site visit, it was a concrete pipe capped with steel sheeting on both ends; however, it appeared to have been previously used as a control structure. The pipe that housed the previous tide gate appeared to be in good condition and could potentially be modified in the future for additional uses (fish ladder, etc.). Beverly-01B was located on the eastern end of the spillway and was a steel sluice gate operated by a handwheel. Grease was observed on the handwheel, so it appeared that the gate was periodically operated. The tide gate was in fair condition – the metal sluice gate was badly corroded and was leaking.
Elevation Comments
Staining was apparent on the downstream (D/S) end of the headwall (HW) so approximate extent of D/S tidal influence was able to be assessed in addition to tide gate (TG) invert elevations. Staining was readily not apparent on the upstream (U/S) end of the spillway. The below lists measuredowns taken with a surveyors rod and corresponding top of headwall LiDAR elevations (NAVD88 datum). 1) TG Inv (D/S tide gate): Top of HW El (D/S) = 6.53’; Inv Measuredown = 6.79’; TG Inv = 6.79’ – 7.10 = -0.31’ 2) Upstream Tidal Influence: N/A 3) Downstream Tidal Influence: Top of headwall LiDAR elevation = 10.10’; Staining Measuredown = 4.4’; D/S Tidal Influence = 10.10’ – 4.4’ = 5.70’
Visit Comments
Other Comments
External Data Comments