TideGateway

Everett-01

Everett, Mystic River

42.400417, -71.053599

Technical Specifications

Basic Properties

Type
Tide Gate
Material
Metal
Control
—
Condition
Poor
Geometry
—
Status
Inactive
Number of Gates
—

Operator & Management

Operator Type
PRIVATE
Operator
—
Permits
—
Purpose
Flood Protection

Dimensions & Elevations

Dimensions
—
Invert Elevation
—
Installation Date
—
Tidal Influence
—

Culvert Details

Restriction Type
—
Geometry
—
Material
—
Bottom Material
—
Number of Pipes
—
Dimensions
—
Condition
Poor
Comments
—

Restoration Potential

Restoration prioritization and planning information from MassBays regional coordination

Assessment

Salt Marsh Impairment due to Tidal Restriction
Moderate
Potential Extent of Marsh Restoration
Moderate
Implementation Feasibility
High
Restoration Priority
High
Recommended Improvement Type
O&M and Infrastructure

Notes

Site shows moderate salt marsh impairment due to restricted tidal flow. Replacement with self-regulating tide gate could restore approximately 5-8 acres of degraded marsh habitat. Good access for construction equipment. Regional coordination completed with town DPW and conservation commission.

Historical Records

Legacy data from previous surveys and documentation

Environmental Data

Invasive Species
—
Restoration Status
—
Invasive Comments
—
Restoration Comments
—
Upstream Area
—

Notes & Comments

General Comments
There has been contention of who owns this infrastructure and the pipe/culvert heading south/southeast to the outlet at the Island End River. The owner may or may not be the Boston Market Terminal. The gate does not fuction.
Operation Plan
No
Operation Comments
—
Gate Comments
—
Elevation Comments
—
Visit Comments
—
Other Comments
—
External Data Comments
—
© 2026 Massachusetts Bays Program. Monitoring tidegates across Massachusetts.