Basic Properties

Type
Flap Gate
Material
Metal
Control
Condition
Good
Geometry
Rectangular
Status
Active
Number of Gates
0

Operator & Management

Operator Type
PUBLIC
Operator
City of Gloucester
Permits
ACOE
Purpose
Flood Protection

Dimensions & Elevations

Dimensions
6ft diameter, 4ft height
Invert Elevation
2.74 NAVD88
Installation Date
2011
Tidal Influence
Upstream: 3.54 NAVD88, Downstream: 3.84 NAVD88

Culvert Details

Restriction Type
Roadway
Geometry
Other
Material
Corrugated Metal
Bottom Material
Riprap
Number of Pipes
0
Dimensions
13ft diameter, 12ft height
Condition
Fair
Comments
The culvert material was corrugated metal piping and was a semi-circle with an approximate width of 13’ and an approximate height of 12’. The upstream portion of the culvert appeared to be in good condition with no apparent deterioration; however, the downstream portion was slightly separating from the headwall in places. Additionally, portions of the downstream culvert were jagged and appeared to pose a potential safety hazard.

Salt Marsh Field Assessment Results

Comprehensive field assessment data
2024 Field Assessment Protocols →

Physical Conditions Assessment

Channel Conditions

Channel Alteration and Ditching
Limited (<133 ft/acre)
Channel Constriction
Narrower than channel
Channel Erosion
Little (<10% of bank)
Sediment Deposits
None

Blockages

Debris Blockages
None
Evidence of Overtopping
No

Ecological Assessment

Habitat Observations

Ecological Impairment due to Tide Gate
Limited
Crab Burrow Intensity
None
Ponding and Die-off Depressions
Phragmites Present
Moderate (10-60%)

Invasive Species

Upstream Invasive Species
Yes
Downstream Invasive Species
No
Invasive Species Notes
Limited to upland fringe

General Comments

Appears to have sufficient tidal exchange as indicated by lack of phragmites and abundant saltwater invertebrate populations. Town noted tide gate is sometimes closed for extended periods of time. Result of which may have I ncreased ponding and creation of mud flats adjacent to marshy areas. Tide gate was draining well during visit but long term management or o and m plan may help restore more salt marsh.

Habitat Transects

First Transect (50 yards upstream of tide gate)

Second Transect (150 yards upstream of tide gate)

Third Transect (300 yards upstream of tide gate)

Restoration Potential

Restoration prioritization and planning information from MassBays regional coordination

Assessment

Salt Marsh Impairment due to Tidal Restriction
Moderate
Potential Extent of Marsh Restoration
Moderate
Implementation Feasibility
High
Restoration Priority
High
Recommended Improvement Type
O&M and Infrastructure

Notes

Site shows moderate salt marsh impairment due to restricted tidal flow. Replacement with self-regulating tide gate could restore approximately 5-8 acres of degraded marsh habitat. Good access for construction equipment. Regional coordination completed with town DPW and conservation commission.

Historical Records

Legacy data from previous surveys and documentation

Environmental Data

Invasive Species
Yes
Restoration Status
In-Progress
Invasive Comments
Abundant phragmites was observed upstream. It appeared that the phragmites extended to the upstream dam in Mill Pond.
Restoration Comments
New tide gates installed in 2011, 1 gate is being opened an additional 6 inches each year over 6 years. 2016 opening will occur in May.
Upstream Area

Notes & Comments

General Comments
Site was easily accessible and located directly off of Washington Street (Route 127). Parking was available at a convenience store to the northeast of the site.
Operation Plan
Yes
Operation Comments
It appears that the operational purpose of Gloucester-01A was for incremental restoration and flood protection purposes. It can be incrementally opened to enable increased tidal flushing with the ability to be completely closed before a storm. It appears that the operational purpose of Gloucester-01B was two-fold: 1) It could be installed towards the invert of the headwall and be incrementally opened to enable restoration while enable outward passage of stormwater flows and mitigating flood potential from the tides. 2) It could be installed at the high position to act as a high level barrier to storm surge while allowing stormwater out the bottom. It appeared that Gloucester-01C was installed for the sole purpose of flood protection and stormwater conveyance. It appears that this trio of tide gates was recently installed and configured in 2011 and are being actively managed to enable upstream restoration.
Gate Comments
There were three tide gates at the site. Gloucester-01A was an old sluice gate with a manual jack screw located at the bottom of the eastern portion of the headwall. It was open approximately 2’ at the time of the site visit. Gloucester-01B was a newer combination metal sluice / flap gate. The sluice gate was able to operated via jack screw to be installed either at the invert of the headwall or towards the top. It was located towards the top of the headwall during the site visit, enabling low level tidal flushing through the bottom opening. Gloucester-01C was a metal flap gate installed in the middle portion of the headwall (i.e., Gloucster-01B could be located either above or below Gloucester-01C) (see field notes for diagram). All three of the tide gates appeared to be in good condition at the time of the site visit. Gloucester-01A was rusty, but corrosion was not evident and it appeared that the manual gear had recently been maintained and greased.
Elevation Comments
Staining was apparent on the upstream (U/S) and downstream (D/S) ends of the headwall (HW) so approximate extent of U/S and D/S tidal influence was able to be assessed in addition to tide gate (TG) invert elevations. The below lists measuredowns taken with a surveyors rod and corresponding top of headwall LiDAR elevations (NAVD88 datum). 1a) TG Inv (Gloucester-01A = Gloucester-01B): Top of HW El (D/S) = 7.74’; Inv Measuredown = 12.2’; TG Inv = 7.74’ – 12.2 = -4.46’ 1b) TG Inv (Gloucester-01C): Top of HW El (D/S) = 7.74’; Inv Measuredown = 5.00’; TG Inv = 7.74’ – 5.00 = 2.74’ 2) Upstream Tidal Influence: Top of headwall LiDAR Elevation = 7.74’; Staining Measuredown = 4.20’; U/S Tidal influence = 7.74 – 4.20 = 3.54’. 3) Downstream Tidal Influence: Top of headwall LiDAR elevation = 7.74’; Staining Measuredown = 3.90’; D/S Tidal Influence = 7.74’ – 3.90’ = 3.84’
Visit Comments
Other Comments
External Data Comments
US ACOE CENAE-R-2008-2941 Permit 5.11.2009 Mill Pond Operation and Maintenance Plan Revised 8.13.2010 Mill River Tidal Restoration Project Monitoring Summary 7.20.2015