TideGateway

Harwich-02

Harwich, Red River

41.667768, -70.044646

Technical Specifications

Basic Properties

Type
Multiple
Material
Metal
Control
Manual Gear
Condition
Good
Geometry
Rectangular
Status
Active
Number of Gates
0

Operator & Management

Operator Type
PUBLIC
Operator
Harwich Harbormaster / Department of Natural Resources
Permits
Order of Conditions
Purpose
Flood Protection and Restoration

Dimensions & Elevations

Dimensions
3ft diameter, 4ft height
Installation Date
2012

Culvert Details

Restriction Type
Roadway
Geometry
Rectangular
Material
Concrete
Bottom Material
Riprap
Number of Pipes
0
Dimensions
3ft diameter, 4ft height
Condition
Good
Comments
According to the O&M plan dated 12/14/2012,the 3' by 4' concrete box culvert was installed under Old Wharf Road in May 2012.

Historical Records

Legacy data from previous surveys and documentation

Environmental Data

Invasive Species
Yes
Restoration Status
In-Progress
Invasive Comments
According to the Cape Cod tidal atlas, "phragmites growth is significant near the seaward opening, but only minor in the site's upstream affected area."
Restoration Comments
According to the O&M plan dated 12/14/2012, restoration is underway and being performed iteratively.
Upstream Area
Salt Marsh: 5.54

Notes & Comments

General Comments
Site is located at Old Wharf Road directly to the north of the Red River Beach Parking Lot. New tide gate installed as part of the Red River restoration project. Implemented as part of the Cape Water Resources Plan, the project involved two culvert replacements behind the town beach. The project was implemented by the Town of Harwich and included a new culvert and gate within the upper marsh to prevent storm flooding of an abutter.
Operation Plan
Yes
Operation Comments
According to the O&M plan dated 12/14/2012, the operational goal is to manage high tide levels to prevent tidal flow onto the driveway at 104 Julien Road while maximizing tidal exchange in the marsh. "The tide gate will be set to restrict the proposed high tide level at the Upper Marsh to elevation 2.5 NAVD88"." Additional and specific operation notes are present in the O&M plan.
Gate Comments
According to the O&M plan dated 12/14/2012, the culvert was fitted with an "adjustable combination slide and flap gate, manufactured by Whipps Inc. of Athol, MA."
Elevation Comments
Specific tide gate and tidal influence elevations were not present in the O&M plan dated 12/14/2012.
External Data Comments
Final Red River Beach Tide Gate Operation and Maintenance Plan May 2012
© 2025 Massachusetts Bays Program. Monitoring tidegates across Massachusetts.