- Operation Plan
- Yes
- Operation Comments
- O&M Plan overseen by TAC.
- Gate Comments
- (2) 5'7x7' tide gates replaced in 2010, automated, 3.8 NGVD29 max elevation
- External Data Comments
- MA DEP Water Quality Cert #W133268 3.4.2008
US ACOE Permit NAE-2005-02204 5.6.2008
Final Straits Pond Tide Gate Operation and Maintenance Plan 12.5.2007
Straits Pond Real Time Monitoring Link https://www.hobolink.com/p/f211da46192a963a9c371d86ea6e7c6e
Revised Straits Pond 2012 Monitoring Summary
Three (3) engineering design sheets located in "other" folder