TideGateway

Marshfield-02B

Marshfield, Green Harbor

42.089292, -70.644468

Technical Specifications

Basic Properties

Type
Flap Gate
Material
Metal
Condition
Good
Geometry
Rectangular
Status
Active
Number of Gates
4

Operator & Management

Operator Type
PUBLIC
Operator
Town of Marshfield
Permits
ACOE
Purpose
Flood Protection and Restoration

Dimensions & Elevations

Dimensions
4ft diameter, 3ft height

Culvert Details

Restriction Type
Roadway
Geometry
Rectangular
Material
Concrete
Number of Pipes
2
Dimensions
4ft diameter, 3ft height
Condition
Good
Comments
Both culverts appeared to be in good condition. The upstream wingwall was in good condition, but appeared to be starting to slightly separate from the headwall.

2024 Field Survey Results

Comprehensive field assessment conducted in 2024

Physical Conditions Assessment

Channel Conditions

Channel Alteration
Limited (<133 ft/acre)
Channel Constriction
Narrower than channel
Channel Erosion
Little (<10% of bank)
Sediment Deposits
None

Blockages & Issues

Debris Blockages
Limited (<10% of opening)
Evidence of Overtopping
No

Transect Measurements

50 Yards

Open Water
0
Salt Marsh
26
Brackish
0
Freshwater
0
Ditch
8
Unvegetated
68

150 Yards

Open Water
0
Salt Marsh
57
Brackish
0
Freshwater
0
Ditch
12
Unvegetated
13

300 Yards

Open Water
0
Salt Marsh
111
Brackish
5
Freshwater
0
Ditch
5
Unvegetated
38

Ecological Assessment

Habitat Observations

Crab Burrow Intensity
None
Ponding Depressions
Severe (>60% of marsh platform
Phragmites Present
Severe (>60%)
Ecological Impairment
Severe

Invasive Species

Upstream Invasive Species
Yes
Downstream Invasive Species
Yes
Invasive Species Notes
Phragmites along fringe, becomes dense and surrounding channel approximate 570 feet upstream of tide gate.
Additional Comments (2024)
Tide gate submerged due to incoming tide, not all factors could be assessed, however severe die off, lack of low marsh community, constriction of sediment exchange and encroaching phragmites indicate tidal restriction.

Historical Records

Legacy data from previous surveys and documentation

Environmental Data

Invasive Species
Yes
Restoration Status
In-Progress
Invasive Comments
Upstream impoundment was mostly comprised of high marsh with some low marsh and fringing phragmites.
Restoration Comments
Due to be replaced with self-regulating tidegate (FEMA Project IMPACT).
Upstream Area
Salt Marsh: 10-15 acres

Notes & Comments

General Comments
Site is located directly off of Town pier Road and easily accessible. Note that Jason Burtner can provide permitting drawings and other relevant files and site information to further flesh out attributes. Permitted together with Marshfield 01
Operation Plan
Yes
Gate Comments
There were two tide gates installed at this location. A metal self-regulating tide (SRT) gate was installed to the west (Marshfield-02A) and a metal flap gate was installed to the east (Marshfield-02B). The self-regulating tide gate was in good condition and was operable (all of its floats were intact). The SRT was installed at a 45 degree angle to enable it to directly face the channel. A hand operated winch and strap had been installed to operate the SRT and the strap was weathered. The metal flap gate appeared to be in good condition and operable.
Elevation Comments
See "General Comments". Invert elevation and extent of downstream tidal influence can be located on permitted plans to be uploaded. Staining was not apparent on the upstream headwall (i.e., it was higher), so extent of upstream tidal influence could not be assessed.
Other Comments
Many killifish were observed on the downstream side of the tide gate.
External Data Comments
US ACOE NAE-2004-3126 Green Harbor Tide Gates Permit Application 10.2.2002 US ACOE NAE-2004-3126 Green Harbor Tide Gates Permit 12.3.2004 US ACOE NAE-2004-3126 Green Harbor Tide Gates Operation and Maintenance Plan 12.3.2004