- General Comments
- Tide gates are located under Quincy Shore Drive, a short walk south of Caddy Memorial Park. Additional data needed: O&M, Engineering Plans, and Permits from when Tide Gates were installed.
- Operation Plan
- No
- Operation Comments
- O&M plan is likely present. Appears to be designed to deploy based on float switch when water level reaches float at approx. 12'.
- Gate Comments
- Set of 3 identical metal tide gates with hinge installed underneath road. Tide gate diameter and height is approximate and should be confirmed with Engineering Plans. There are locations along the concrete headwall to insert metal stop logs for additional water level control.
- Elevation Comments
- Staining was apparent on the upstream (U/S) and downstream (D/S) ends of the headwall (HW) so approximate extent of U/S and D/S tidal influence was able to be assessed in addition to tide gate (TG) invert elevations. The below lists measuredowns taken with a surveyors rod and corresponding top of headwall LiDAR elevations (NAVD88 datum).
1) TG Inv (in this case measured to invert of U/S culvert): Top of HW El (U/S) = 11.32’; Inv Measuredown = 15.17’; TG Inv = 11.32 – 15.17 = -3.85’
2) Upstream Tidal Influence: Top of headwall LiDAR Elevation = 11.32’; Staining Measuredown = 9.25’; U/S Tidal influence = 11.32 – 9.25 = 2.07’.
3) Downstream Tidal Influence: Top of headwall LiDAR elevation = 11.38’; Staining Measuredown = 8.1’; D/S Tidal Influence = 11.38’ – 8.10’ = 3.28’
- External Data Comments
- MA DEP Order of Conditions 8.7.2013
MA General Permit Application 4.29.2013
US ACOE NAE-2012-2284 Permit Application 3.28.2013
Tide Gate Operation and Maintenance Plan 12.19.2013
NOAA Comments on Permit NAE-2012-2284 6.30.2014 (Other)
US ACOE Fenno St. Comments on Permit NAE-2012-2284 (Other)
EPA Letter on Permit NAE-2012-2284 3.25.2014 (Other)
MA CZM Comments on Permit NAE-2012-2284 4.1.2014 (Other)
Black Creek Tide Gate Acceptance of Transfer 1.18.2002 (Other)