TideGateway

Rowley-03

Rowley, In Between Bill Forward and North Pool

42.741179, -70.796661

Technical Specifications

Basic Properties

Type
Tide Gate
Condition
Unknown
Status
Inactive
Number of Gates
0

Operator & Management

Operator Type
PUBLIC
Operator
USFWS
Permits
Unknown - structure predates other control structures in the refuge.

Dimensions & Elevations

Culvert Details

Restriction Type
Berm
Number of Pipes
0
Condition
Unknown

Historical Records

Legacy data from previous surveys and documentation

Notes & Comments

General Comments
Site located at the Parker River National Wildlife Refuge at a berm not accessible by the general public. USFWS must be contacted to obtain access. Followups - USFWS can provide additional details with a field visit including tide gate and culvert dimensions, invert elevations, and upstream acreage.
Operation Plan
No
Operation Comments
The original operational purpose of the tide gate was to move water between North Pool and Bill Forward. The tide gate is inactive and is no longer operated.
Gate Comments
Tide gate characteristics are unknown.
© 2025 Massachusetts Bays Program. Monitoring tidegates across Massachusetts.