TideGateway

Salisbury-01A

Salisbury, Town Creek

42.830882, -70.866953

Technical Specifications

Basic Properties

Type
Multiple
Material
Metal
Control
Manual Gear
Condition
Good
Geometry
Rectangular
Status
Active
Number of Gates
2

Operator & Management

Operator Type
PUBLIC
Operator
Permits
WQC, Ch 91, ACOE
Purpose
Flood Protection

Dimensions & Elevations

Dimensions
4ft diameter, 5ft height
Invert Elevation
-2.81 NAVD88
Installation Date
2013
Tidal Influence

Culvert Details

Restriction Type
Berm
Geometry
Rectangular
Material
Concrete
Bottom Material
Sand
Number of Pipes
2
Dimensions
4ft diameter, 5ft height
Condition
Good
Comments
Each tide gate was installed in a concrete box culvert with approximate dimensions of 4' by 5'. Both culverts were installed in conjunction with the tide gates in 2013 and appeared to be in good condition with no signs of deterioration.

Salt Marsh Field Assessment Results

Comprehensive field assessment data
2024 Field Assessment Protocols →

Physical Conditions Assessment

Channel Conditions

Channel Alteration and Ditching
Limited (<133 ft/acre)
Channel Constriction
Narrower than channel
Channel Erosion
Moderate (10-60% of bank)
Sediment Deposits
None

Blockages

Debris Blockages
Limited (<10% of opening)
Evidence of Overtopping
No

Ecological Assessment

Habitat Observations

Ecological Impairment due to Tide Gate
Severe
Crab Burrow Intensity
None
Ponding and Die-off Depressions
Moderate (10-60% of marsh platf
Phragmites Present
Severe (>60%)

Invasive Species

Upstream Invasive Species
Yes
Downstream Invasive Species
Yes
Invasive Species Notes
Near mono culture of phragmites on both up and downstream side. Narrow bands of low marsh on upstream side.

General Comments

Tide gate is actively managed. Remote operation does not work so gated are manually closed by DPW. Gates are typically left open at 12 in. Opening appears to be too small and is ponding flow on both sides of tide gate. Restriction of incoming tide ponds flow on downstream side due to lost storage. Small bands of low marsh exist on upstream side but improved drainage may help restore marsh community. Openings are 4x5 ft boxes only left at 12 so plenty of room for improvement without redesign. Fixing telemetry data may increase operation adjustments as well. Coordination with Hudson’s boat yard will be needed to not flood yard and is limiting factor in management.

Habitat Transects

First Transect (50 yards upstream of tide gate)

No data

Second Transect (150 yards upstream of tide gate)

No data

Third Transect (300 yards upstream of tide gate)

No data

Restoration Potential

Restoration prioritization and planning information from MassBays regional coordination

Assessment

Salt Marsh Impairment due to Tidal Restriction
Moderate
Potential Extent of Marsh Restoration
Moderate
Implementation Feasibility
High
Restoration Priority
High
Recommended Improvement Type
O&M and Infrastructure

Notes

Site shows moderate salt marsh impairment due to restricted tidal flow. Replacement with self-regulating tide gate could restore approximately 5-8 acres of degraded marsh habitat. Good access for construction equipment. Regional coordination completed with town DPW and conservation commission.

Historical Records

Legacy data from previous surveys and documentation

Environmental Data

Invasive Species
Yes
Restoration Status
Unknown
Invasive Comments
Upstream area was predominately comprised of phragmites.
Restoration Comments
Large upstream area has strong restoration potential if a balance can be struck between upstream flood protection of Route 1 businesses.
Upstream Area

Notes & Comments

General Comments
Site is located on the Old Eastern Marsh Trail bike path to the west of route 1. The site is accessible by parking at the Enpro services parking lot and walking to the north for approximately 1/4 mile.
Operation Plan
Yes
Operation Comments
The primary purpose of the tide gates was flood protection of upstream areas (e.g., Route 1 and associated businesses). There were water level sensors installed on posts with solar panels on the upstream and downstream portion of the berm. These monitoring stations were potentially logging life data via cellular modems and transmitting to the Town DPW to alert staff to close the tide gates in advance of a storm or when water levels reach a certain threshold.
Gate Comments
There were two identical tide gates at the site. Salisbury-01A was located to the north and Salisbury-01B was located to the south on the downstream side of the bike path berm. Both tide gates were metal combination sluice / flap gates (i.e., they could adjusted upwards or downward via a manual gear to enable full tidal flow or no tidal flow). Both tide gates appeared to be in good condition. The valve stem for each tide gate was visible via a clear marked PVC pipe, thus enabling a user to know the exact level of adjustment. At the time of the site visit, the tide gates were adjusted open 1’ and had a range of up to 3’.
Elevation Comments
Staining could not be evaluated on the upstream or downstream ends of the culverts – a gently sloping riprap embankment was present, so measuredowns and corresponding LiDAR spot elevations would not be able to be correlated. There were staff gauges installed on the upstream and downstream sides of the berm (datum and measurement units unknown). It appeared that the mean high water mark on the upstream side was approximately “12” and “20” on the downstream side. The invert of the tide gates was obtainable. The below lists the measuredown taken from the tide gate headwall to the invert corresponding top of headwall LiDAR elevation (NAVD88 datum). 1) TG Inv (D/S): Top of HW El (D/S) = 4.19’; Inv Measuredown = 7.00’; TG Inv = 7.74’ – 12.2 = -2.81’
Visit Comments
Other Comments
External Data Comments
US ACOE CENAE-R-2011-1402 Permit with Draft Operation and Maintenance Plan (signed) 5.10.2012 US ACOE CENAE-R-2011-1402 Modification 10.31.2014 Chapter 91 License W12-3660 Application 8.6.2012 Chapter 91 License W12-3660 License No. 13350 10.3.2012 MA DEP 401 WQC X250782 7.16.2012 (Permits) MA DEP 401 WQC X250782 Amendment 1 NAE-2012-1402 X251806 5.6.2014 (Permits) MA BUAR Comment Letter 12.29.2011 (Other)