TideGateway

Scituate-04

Scituate, Herring River

42.171536, -70.750239

Technical Specifications

Basic Properties

Type
Flap Gate
Material
Metal
Control
Condition
Good
Geometry
Circular
Status
Active
Number of Gates
1

Operator & Management

Operator Type
PUBLIC
Operator
Town of Scituate
Permits
Unknown
Purpose
Flood Protection

Dimensions & Elevations

Dimensions
1.25ft diameter
Invert Elevation
-0.08 NAVD88
Installation Date
1992
Tidal Influence

Culvert Details

Restriction Type
Berm
Geometry
Circular
Material
Concrete
Bottom Material
Number of Pipes
1
Dimensions
1ft diameter
Condition
Good
Comments
Debris grate observed on upstream end of culvert; was rusty but appeared to be in good condition. Erosion observed around downstream headwall. Resident indicated that berm periodically overtops during flood tide at low point near Cushing Road.

Restoration Potential

Restoration prioritization and planning information from MassBays regional coordination

Assessment

Salt Marsh Impairment due to Tidal Restriction
Moderate
Potential Extent of Marsh Restoration
Moderate
Implementation Feasibility
High
Restoration Priority
High
Recommended Improvement Type
O&M and Infrastructure

Notes

Site shows moderate salt marsh impairment due to restricted tidal flow. Replacement with self-regulating tide gate could restore approximately 5-8 acres of degraded marsh habitat. Good access for construction equipment. Regional coordination completed with town DPW and conservation commission.

Historical Records

Legacy data from previous surveys and documentation

Environmental Data

Invasive Species
Yes
Restoration Status
Not Applicable
Invasive Comments
Upstream impoundment was predominately comprised of phragmites. Appeared that there was little to no tidal influence.
Restoration Comments
Would potentially be a good restoration candidate - minimal low lying infrastructure was observed; however, upstream area is used by the town as a drinking water well field.
Upstream Area
Salt Marsh: >20 acres

Notes & Comments

General Comments
The site is easily accessible by walking south along a grassed berm at the end of Cushing Road for approximately 500 feet.
Operation Plan
No
Operation Comments
Gate Comments
Circular metal hinged flap gate was operable and appeared to be in good condition. Resident indicated that it was rebuilt shortly after the storm of 1991.
Elevation Comments
Extent of existing downstream tidal influence unable to be assessed; staining mark appeared to extend above top of headwall. Extent of existing upstream tidal influence unable to be assessed; hinged gate did not appear to allow any upstream tidal influence. The approximate invert elevation was assessed. The below lists measuredowns taken with a surveyors rod and corresponding top of headwall LiDAR elevations (NAVD88 datum). 1) TG Inv (D/S tide gate): Top of HW El (D/S) = 2.92’; Inv Measuredown = 3.00’; TG Inv = 3.00’ – 2.92 = -0.08’
Visit Comments
Other Comments
Area on the upstream side is now part of the town’s drinking water wellfields
External Data Comments
© 2026 Massachusetts Bays Program. Monitoring tidegates across Massachusetts.