TideGateway

Wellfleet-02B

Wellfleet, Herring River

41.930047, -70.029536

Technical Specifications

Basic Properties

Type
Flap Gate
Material
Metal
Geometry
Rectangular
Status
Active
Number of Gates
3

Operator & Management

Operator Type
PUBLIC
Operator
Town of Wellfleet / Cape Cod National Seashore

Dimensions & Elevations

Dimensions
7ft diameter, 7ft height

Culvert Details

Restriction Type
Roadway
Geometry
Rectangular
Material
Concrete
Number of Pipes
3
Dimensions
7ft diameter, 7ft height
Comments
One of the culverts is a 6' x 6' box

2024 Field Survey Results

Comprehensive field assessment conducted in 2024

Physical Conditions Assessment

Channel Conditions

Channel Alteration
None
Channel Constriction
Equal to channel
Channel Erosion
None
Sediment Deposits
None

Blockages & Issues

Debris Blockages
None
Evidence of Overtopping
No

Transect Measurements

50 Yards

Open Water
0
Salt Marsh
0
Brackish
0
Freshwater
0
Ditch
0
Unvegetated
0

150 Yards

Open Water
0
Salt Marsh
0
Brackish
0
Freshwater
0
Ditch
0
Unvegetated
0

300 Yards

Open Water
0
Salt Marsh
0
Brackish
0
Freshwater
0
Ditch
0
Unvegetated
0

Ecological Assessment

Habitat Observations

Crab Burrow Intensity
None
Ponding Depressions
None
Phragmites Present
None
Ecological Impairment
None

Invasive Species

Upstream Invasive Species
No
Downstream Invasive Species
No
Additional Comments (2024)
Marsh inaccessible due to large scale construction. Bridge and culvert are being completely replaced and redesigned. Marsh should be reassessed after construction is complete.

Historical Records

Legacy data from previous surveys and documentation

Environmental Data

Restoration Comments
Planning and permitting largely complete; fundraising for restoration construction is ongoing. Construction could occur in the next 5 years if funds are obtained.
Upstream Area
Total: 1000, Salt Marsh: 0.81

Notes & Comments

General Comments
Refer to Wellfleet-02A for source data.
Gate Comments
Two flapper gates installed at two 7'x7' box culverts and an adjustable sluice gate installed at a 6'x6' box culvert.
© 2025 Massachusetts Bays Program. Monitoring tidegates across Massachusetts.